Monday, March 26, 2007

Revisions...


During production for the final review, we noticed some problems with the fit between panels and surface topography needed for vacuum forming. Some of our geometry was too extreme to get a good pull with the PETG plastic.
Today has been spent re-modeling and re-scaling everything so as to achieve a precise fit between panels. Everything was given a 1/8" tolerance to take into account the initial 1/16" ABS layer on the form as well as the 1/16" PETG final pull. The revisions should be pretty much complete by tomorrow, so actual construction will begin shortly.

Also we are getting ready to send out invites for the "Superglow Soiree", our pre-opening fundraising celebration. The invite will be posted soon.

In the meantime, I am posting a video of our lighting behavioral model. Two streams of light travel through the "tubes" from door to mullion which then set off two separate reactions at the mullion. This was a programmed behavior, but we are currently re-writing the script to allow the behavior to be controlled through proximity sensors which will actually create an interactive condition as people approach the installation.