Oakland Airport and the end of year two



Finally finished up second year, and the Oakland Airport project. For the last half of the quarter we zoomed in to a smaller scale of work, concentrating on only five jetways and a portion of the support core. The initial circulation and program studies were heavily interested in developing a skeletal sort of architecture drawing from examples in nature. The airport's circulation core, and support program such as shopping, dining and restrooms nested within a central spine, branching out to connect to the jetways.
Since the beginning, a series of linework diagrams informed the design process. The plan became a layering of slabs, structure and systems, with each part complementing the next. On a macro scale, the linework flow is linear down the length of the building, but at a detail level the plan starts to work laterally with flows fingering out from spine.
The project was developed primarily through polygon modeling in Maya, with a couple scripts being used to automatically generate the secondary structural system based off surface isoparms. Looking back, it would have been nice to use some of the animation tools a bit more. The process was always initiated through 2D drawings which meant a greater degree of control over the linework and plan, but perhaps animation could have introduced some nice sectional variation and a smoother flow between surfaces.













Friday, May 11, 2007

Sunny Days, Millipedes, and Airplanes



After an intensive couple weeks concentrating on wrapping up Superglow, I am finally back full time on the Oakland Airport Terminal. This past Monday the class took a short flight up to Oakland to get a behind the scenes tour of the facilities. We also were able to spend some time enjoying San Francisco on the nicest day so far of this year. The weather was sunny and in the upper 80's. Beautiful! The SF Federal building is nearly complete, and I was also able to see Pier Luigi Nervi's incredible church. It never ceases to amaze me what architects and engineers were able to accomplish fourty years ago using hand drafting and slide rules.

I've been studying examples of joints and scales in nature, looking a lot at millipedes and iguanas. Our airport terminal is developing around the idea of programmatic and circulation core from which grow jetways, much as many legs attach to a central skeletal system.





Monday, May 7, 2007

Pictures

Apparently "this evening" really means 4 am... I am posting some images from the past week of our project. I have some higher quality images of the final installed pieces that I will try to get uploaded soon.










Sunday, May 6, 2007

Time for a breather...

I haven't been able to post for a while, the past two weeks have been incredibly busy trying to get our installation ready. After many nights of three or four hours of sleep, plus a couple all nighters, we successfully installed our project in Silverlake yesterday for the Nokia photoshoot. This was a sort of warm-up run for the final installation on May 25th, but it allowed us to complete fabrication and work out kinks in the lighting and connections before the piece went up for public display.
I'll be posting photographs of the final construction process as well as the finished installation this evening.